CONCEPT ENGINEERING. AUTOMATED.

From a process sketch to an optimized, costed plot plan.

We develop the equipment arrangement, pipe routes, quantities, and preliminary installed-cost estimate. Your engineers review the concept.

FEL 1 / FEL 2 SUPPORTGREENFIELD & BROWNFIELD CONCEPTS
FORGE / CONCEPT WORKSPACE001
EQUIPMENT SPACINGROUTING CORRIDORSERVICE CONNECTIONSN ↑CONCEPT / 001
✓
One connected concept.Placement → routing → quantities → cost
PROCESS INPUT → REVIEWABLE OUTPUTIllustrative model
01

Start earlier. A readable diagram is enough to begin a concept.

02

Explore more. Generate and compare equipment arrangements.

03

See the economics. Connect geometry to quantities and cost.

01 / WHAT YOU GET

One run.
A full project package.

From equipment placement and pipe connections to roads, water retention and the installed-cost estimate. Your outputs share one project basis, so you can trace the overall concept down to individual quantities and costs.

  1. Equipment modeling & layout

    • Tagged equipment models and an equipment inventory
    • Placement, spacing, access and maintenance clearances
    • Equipment quantities and foundation allowances
  2. Pipe routing & connections

    • Routes connecting equipment and utility interfaces
    • Pipe lengths, sizes, materials, bends and supports
    • Routing, spacing and connection checks
  3. Line list

    • A register of lines and their source-to-destination connections
    • Service, nominal size, material and routed length
    • Line tags, routing status and spreadsheet exports
  4. Total Installed Cost (TIC)

    • A project estimate built from the modeled scope
    • Equipment, piping, civil works and installation labor
    • Indirect costs, allowances and contingency with their basis
  5. Detailed quantities & costs

    • Material takeoffs by equipment, line and site feature
    • Weld counts, fittings, supports and fabrication labor
    • Quantities, units, unit rates and itemized cost calculations
  6. Module recommendations

    • Suggested equipment groupings and skid or module boundaries
    • Connections and interfaces between proposed modules
    • Layout options for comparing modular approaches
  7. Civil works & site infrastructure

    • Access roads, parking, crane hardstands and laydown areas
    • Drainage, stormwater retention and containment
    • Earthworks, concrete, shared trenches and buried utilities
  8. 3D models & plot plans

    • An interactive model of equipment, piping and civil works
    • Rotate, zoom and inspect the site from above or below
    • Plot plans, saved views and model exports
  9. FEL 1 / FEL 2 project package

    • A connected concept report for engineering review
    • Alternative layouts or systems with quantities and cost comparisons
    • Design assumptions, validation results and open review items

DOWN TO THE WELDS

What goes into a 6-inch steel line?

See its pipe length, estimated weld count, fittings, supports and fabrication hours—alongside the unit rates and costs. Follow each line item back to the quantities and assumptions behind it.

  • Pipe size & material
  • Length & weld count
  • Fittings & supports
  • Labor hours & unit rates
  • Itemized installed cost

Delivered with the estimate basis, assumptions and open items for your engineers to review. The package follows your agreed project scope.

Explore the generated model See the full Case Study

02 / THE DIFFERENCE

Your team buys
a concept package.

Existing tools automate important tasks. Forge handles the input-to-package workflow as a service—including developing the equipment arrangement.

THE WORK
forgeManaged generation + delivery
OptiPlantConcept design software
OptiRouterRouting in a design platform
01Start from early information
FORGE Automatic extraction

Readable diagram or sketch, with assumptions recorded.

OPTIPLANT WORKFLOWProcess engineering

Prepare equipment and line lists, rack and structure locations.

OPTIROUTER WORKFLOWEngineering / modeling team

Supply an existing 3D model and line information.

02Arrange the equipment
FORGE Automatic placement

Spacing-aware candidate search and cost-informed ranking.

OPTIPLANT WORKFLOWLayout team + Auto Layout

Configure and run the documented V14.5+ automation.

OPTIROUTER WORKFLOWUpstream layout workflow

Existing equipment geometry is an input to routing.

03Develop the piping
FORGE Automatic routing

Routes, lanes, tiers and conceptual post-routing refinement.

OPTIPLANT WORKFLOWPiping team + batch routing

Prepare the routing basis and run automatic routing.

OPTIROUTER WORKFLOWPiping team + autorouting

Automatic nozzle routing in the host design platform.

04Develop the estimate
FORGE Automatic calculation

Modeled quantities, configured rates and cost allowances.

OPTIPLANT WORKFLOWEstimating team + ACCE

Separate integrated estimating software supports direct and indirect costs.

OPTIROUTER WORKFLOWEstimating workflow

Change-cost impact is documented; native full TIC coverage is not established.

05Review and hand off
FORGE One concept package

Plans, routes, quantities, estimate and assumptions for review.

OPTIPLANT WORKFLOWEngineering review + export

Concept editing and transfer toward detailed design.

OPTIROUTER WORKFLOWPiping review + editing

Generated pipes can be refined in the design environment.

What this comparison is based on

Representative role assignments, not mandatory vendor staffing. Current OptiPlant includes Auto Layout and batch routing; OptiRouter also routes automatically. OptiPlant connects to ACCE for estimating, including indirect costs. “Not established” means not verified in the reviewed public documentation. Reviewed 23 October 2026.

Traditional engineering approachWith Forge: one flat project fee.

03 / FOLLOW THE WORK

The traditional way.
The hours add up.

Follow the traditional engineering workflow through FEL 1 and FEL 2, and watch its labor costs add up. Forge delivers your scoped concept package for one flat project fee, at a much lower cost.

See the cost assumptions
TRADITIONAL WORKFLOW / ILLUSTRATIVE56 example steps 8 team lanes 12 weeks

The rising savings total shows illustrative traditional engineering cost avoided, before Forge’s separately quoted flat project fee. Net savings are the shown total minus that fee. The hours and rates below are assumptions.

FEL 1 / PHASE 01

Estimate the work before doing the work.

TRADITIONAL TIMELINEWeek 1
TRADITIONAL COST$7,040

Each discipline builds an hours estimate. Then someone has to assemble the estimates.

64 team hours × $110/hour · Traditional engineering effort
  1. 01Process team estimates its engineering hoursProcess engineering Project management & review
    IN → OUT

    Project brief and preliminary scope

    Process discipline effort estimate

    Scoped fee

    One scoped project package; no separate customer process-hour buildup.

  2. 02Layout team estimates its design hoursLayout team Project management & review
    IN → OUT

    Early site information and equipment scope

    Layout discipline effort estimate

    Scoped fee

    Layout generation is included in the agreed service scope.

  3. 03Piping team estimates its routing hoursPiping team Project management & review
    IN → OUT

    Initial connectivity and expected routing scope

    Piping discipline effort estimate

    Scoped fee

    Routing generation is included in the agreed service scope.

  4. 04Civil team estimates its contributionCivil team Project management & review
    IN → OUT

    Site and conceptual foundation requirements

    Civil discipline effort estimate

    Scoped fee

    Modeled civil quantity and estimate support are scoped together.

  5. 05Structural team estimates its contributionStructural team Project management & review
    IN → OUT

    Potential racks, steel and supports

    Structural discipline effort estimate

    Scoped fee

    Conceptual support modeling is part of the defined package.

  6. 06E&I team estimates its engineering hoursElectrical & instrumentation Project management & review
    IN → OUT

    Initial utility, tray and instrument scope

    E&I discipline effort estimate

    Scoped fee

    The modeled E&I scope is agreed before generation.

  7. 07Project manager consolidates the PSEProject management & review Cost estimating
    IN → OUT

    Individual discipline-hour estimates

    Combined engineering-services budget

    Scoped fee

    Agree the project scope and fee through one service engagement.

  8. 08Review, clarify and approve the effort estimateCost estimating Project management & review
    IN → OUT

    Combined effort estimate and scope questions

    Approved effort budget for this example

    Scoped fee

    No separate customer discipline-hour buildup is needed for the scoped Forge package.

FEL 1 / PHASE 02

Turn early information into a working basis.

TRADITIONAL TIMELINEWeeks 1–2
TRADITIONAL COST$9,600

The diagram, equipment list and design assumptions need to tell the same story.

96 team hours × $100/hour · Traditional engineering effort
  1. 09Read and reconcile the source diagramProcess engineering Layout team
    IN → OUT

    PFD, P&ID, sketch or photographed diagram

    Structured equipment and connection takeoff

    Automatic

    Extract an initial equipment and connection model from a readable source diagram.

  2. 10Build the preliminary equipment listProcess engineering Layout team
    IN → OUT

    Process basis and available equipment information

    Equipment list with conceptual dimensions

    Automatic

    Generate the initial equipment model; supplied dimensions replace recorded assumptions.

  3. 11Establish services and connectivityProcess engineering Piping team
    IN → OUT

    Equipment list, connections and service information

    Preliminary connection and service list

    Automatic

    Assign configured service classes and nominal line sizes for the concept.

  4. 12Agree the assumptions and battery limitsProcess engineering Project management & review
    IN → OUT

    Known inputs, inferred values and missing information

    Reviewed concept basis and interfaces

    Review

    The customer reviews the design basis and inferred information before design use.

FEL 1 / PHASE 03

Find room for everything. Then find a better arrangement.

TRADITIONAL TIMELINEWeeks 2–3
TRADITIONAL COST$13,440

Spacing is a physical constraint—and an economic decision.

128 team hours × $105/hour · Traditional engineering effort
  1. 13Establish equipment footprints and the site envelopeLayout team Civil team
    IN → OUT

    Equipment dimensions, site limits and constraints

    Conceptual equipment footprints and boundaries

    Automatic

    Build the placement model using supplied or explicitly assumed dimensions.

  2. 14Apply spacing, access and corridor requirementsLayout team Piping team
    IN → OUT

    Separation rules, access needs and routing corridors

    Constraint-based layout requirements

    Automatic

    Apply configured equipment separation and corridor constraints; flag unresolved issues.

  3. 15Develop and compare candidate plot plansLayout team Cost estimating
    IN → OUT

    Equipment model and placement constraints

    Candidate arrangements with economic ranking

    Automatic

    Search equipment arrangements and rank candidates using cost-informed objectives.

  4. 16Review the arrangement and pass it to other teamsLayout team Project management & review
    IN → OUT

    Selected candidate and its assumptions

    Reviewed arrangement for concept development

    Review

    The generated arrangement goes to your engineers for review.

FEL 1 / PHASE 04

Put an early cost against the concept.

TRADITIONAL TIMELINEWeeks 3–4
TRADITIONAL COST$4,400

Quantities, rate assumptions and estimate coverage need to line up.

40 team hours × $110/hour · Traditional engineering effort
  1. 17Gather screening-level quantities and scopeLayout team Cost estimating
    IN → OUT

    Concept arrangement and preliminary line information

    Screening quantity and scope summary

    Automatic

    Generate preliminary quantity inputs from the modeled concept.

  2. 18Assign the screening cost basisCost estimating
    IN → OUT

    Quantity groups, configured rates and allowances

    Documented screening cost assumptions

    Automatic

    Apply configured rates and cost assumptions consistently across the modeled scope.

  3. 19Assemble the early installed-cost viewCost estimating Project management & review
    IN → OUT

    Modeled direct costs and early allowances

    Preliminary routed-scope cost summary

    Automatic

    Calculate a preliminary installed-cost view for the explicitly modeled scope.

  4. 20Explain assumptions, exclusions and open itemsCost estimating Project management & review
    IN → OUT

    Screening estimate and uncertain scope

    Estimate basis and questions for review

    Review

    Carry modeled quantities and assumptions into the review package; the estimator reviews coverage.

FEL 1 / PHASE 05

Bring the disciplines back to one decision.

TRADITIONAL TIMELINEWeek 4
TRADITIONAL COST$5,000

A concept only moves forward when the scope, estimate and reviewers agree.

40 team hours × $125/hour · Traditional engineering effort
  1. 21Assemble the FEL 1 support packageLayout team Project management & review
    IN → OUT

    Concept plans, preliminary quantities and estimates

    Coordinated concept review package

    Automatic

    Package the generated layout, routing and estimate outputs together.

  2. 22Coordinate discipline commentsProject management & review Process engineering
    IN → OUT

    Reviewer questions and interface issues

    Consolidated comment register

    Review

    Engineering decisions and comment disposition remain with the reviewers.

  3. 23Revise the selected conceptLayout team Cost estimating
    IN → OUT

    Agreed changes to inputs and assumptions

    Regenerated concept outputs

    Automatic

    Rerun the modeled workflow from updated inputs and regenerate the outputs.

  4. 24Review the gate decisionProject management & review
    IN → OUT

    Updated concept package and unresolved items

    Decision to continue concept development

    Review

    Your team reviews the concept and decides whether to proceed.

TRADITIONAL WAY / FEL 14 weeks$39,480

The concept is ready for its next decision.

The traditional workflow: 24 example steps, 368 team hours, and four illustrative weeks. Next comes more detailed definition.

Continue into FEL 2
FEL 2 / ADDITIONAL DEFINITION

A concept is the beginning.
Now follow the next eight weeks.

FEL 2 / PHASE 06

Make the equipment connections work in space.

TRADITIONAL TIMELINEWeeks 5–7
TRADITIONAL COST$28,800

Nominal diameter, clearances, rack strategy and thermal allowances affect the route.

288 team hours × $100/hour · Traditional engineering effort
  1. 25Prepare routing rules and equipment interfacesProcess engineering Piping team
    IN → OUT

    Reviewed arrangement and line/service basis

    Routing inputs and provisional connection locations

    Automatic

    Use the configured line basis, equipment locations and routing rules.

  2. 26Develop routes through equipment and rack corridorsPiping team Structural team
    IN → OUT

    Connectivity, obstacles, line sizes and clearances

    Preliminary pipe routes and rack demand

    Automatic

    Generate routes with diameter-aware lane placement, clearances and tier assignments.

  3. 27Refine loops, elevations and support strategyPiping team Structural team
    IN → OUT

    Routes, temperature assumptions and rack geometry

    Refined conceptual geometry and support assumptions

    Automatic

    Add conceptual expansion loops, elevation transitions and supports; detailed verification remains separate.

  4. 28Review routing and return conflicts for resolutionPiping team Project management & review
    IN → OUT

    Generated routes and interface issues

    Routing review comments and open issues

    Review

    Review routing issues and the final geometry before accepting the concept.

FEL 2 / PHASE 07

The piping is drawn. Now count what it contains.

TRADITIONAL TIMELINEWeeks 6–8
TRADITIONAL COST$18,240

The takeoff has to cross the boundary from design to estimating.

192 team hours × $95/hour · Traditional engineering effort
  1. 29Extract pipe lengths from the routing modelPiping team
    IN → OUT

    Saved line routes and service assignments

    Preliminary line-by-line quantities

    Automatic

    Extract preliminary route quantities from the saved routing model.

  2. 30Group quantities by size, service and materialPiping team Cost estimating
    IN → OUT

    Route quantities and line properties

    Material groups by nominal size and material

    Automatic

    Group lengths and modeled items by configured line properties.

  3. 31Count fittings, valves and estimated weldsPiping team Cost estimating
    IN → OUT

    Route bends and configured component assumptions

    Preliminary component and weld allowances

    Automatic

    Calculate modeled bends and heuristic valve/weld quantities with their assumptions.

  4. 32Reconcile and hand off the material takeoffPiping team Cost estimating
    IN → OUT

    Takeoff tables and quantity qualifications

    MTO issued to cost estimating

    Review

    Generate the MTO in the same workflow; reconcile exporter-only geometry before final takeoff use.

FEL 2 / PHASE 08

Price every material. Build the installed-cost estimate.

TRADITIONAL TIMELINEWeeks 7–9
TRADITIONAL COST$14,080

Every pipe group needs a rate, a material basis and an installation assumption.

128 team hours × $110/hour · Traditional engineering effort
  1. 33Match each pipe group to a material ratePiping team Cost estimating
    IN → OUT

    MTO grouped by pipe size and material

    Priced pipe and fitting groups

    Automatic

    Apply configured size-based rates and material multipliers to the modeled quantities.

  2. 34Apply welding and installation assumptionsCost estimating
    IN → OUT

    Estimated weld count, diameter-inches and labor basis

    Modeled welding and installation costs

    Automatic

    Calculate welding labor from the configured diameter-inch basis.

  3. 35Add applicable access and testing allowancesCost estimating Project management & review
    IN → OUT

    Modeled labor and allowance assumptions

    Documented installation-related allowances

    Automatic

    Apply configured scaffolding and testing allowances to the modeled labor basis.

  4. 36Reconcile the priced piping estimateCost estimating Project management & review
    IN → OUT

    Priced materials, labor and allowance tables

    Piping cost contribution for consolidation

    Review

    Generate the priced breakdown; your estimator reviews rates, quantities and exclusions.

FEL 2 / PHASE 09

The pipes need supports. Those need an estimate too.

TRADITIONAL TIMELINEWeeks 6–9
TRADITIONAL COST$14,080

Racks, bents, posts and sleepers add quantities and another discipline interface.

128 team hours × $110/hour · Traditional engineering effort
  1. 37Establish the conceptual rack and support arrangementPiping team Structural team
    IN → OUT

    Routing corridors, tiers and support assumptions

    Conceptual support geometry

    Automatic

    Generate conceptual racks and supports using configured spacing assumptions.

  2. 38Count bents, posts and modeled support itemsStructural team Cost estimating
    IN → OUT

    Rack lengths and support arrangement

    Preliminary support quantities

    Automatic

    Calculate modeled rack-bent, post and sleeper quantities.

  3. 39Assign installed support unit ratesStructural team Cost estimating
    IN → OUT

    Support counts and installed-rate assumptions

    Modeled structural cost contribution

    Automatic

    Apply configured installed rates to the support items represented in the cost model.

  4. 40Review and transfer the structural estimateStructural team Project management & review
    IN → OUT

    Support quantities and cost assumptions

    Reviewed contribution to the consolidated estimate

    Review

    Review structural scope and reconcile all support types before estimate acceptance.

FEL 2 / PHASE 10

Concrete has its own takeoff, rates and handoff.

TRADITIONAL TIMELINEWeeks 6–9
TRADITIONAL COST$14,080

Equipment footprints become conceptual pads, volumes and installed costs.

128 team hours × $110/hour · Traditional engineering effort
  1. 41Establish conceptual equipment pad dimensionsLayout team Civil team
    IN → OUT

    Equipment footprints and conceptual pad assumptions

    Preliminary pad geometry

    Automatic

    Generate conceptual pad quantities from equipment footprints and configured assumptions.

  2. 42Calculate concrete volumes and modeled sleepersCivil team
    IN → OUT

    Pad dimensions, depths and support counts

    Concrete quantity summary

    Automatic

    Calculate modeled concrete volumes and sleeper quantities.

  3. 43Assign installed concrete ratesCivil team Cost estimating
    IN → OUT

    Concrete volumes and installed unit rates

    Modeled concrete cost contribution

    Automatic

    Apply configured installed rates to the modeled concrete scope.

  4. 44Reconcile and hand off the civil estimateCivil team Cost estimating
    IN → OUT

    Civil quantities, assumptions and exclusions

    Civil estimate for consolidation

    Review

    Review foundation assumptions and exclusions; detailed geotechnical and foundation design remain separate.

FEL 2 / PHASE 11

Carry the modeled E&I scope into the cost picture.

TRADITIONAL TIMELINEWeeks 7–9
TRADITIONAL COST$8,800

Tray, drops and instrument allowances need a consistent basis.

80 team hours × $110/hour · Traditional engineering effort
  1. 45Develop modeled tray and drop quantitiesElectrical & instrumentation
    IN → OUT

    Rack extent and represented E&I connections

    Conceptual tray and drop quantities

    Automatic

    Generate tray and drop quantities for the represented E&I scope.

  2. 46Establish the instrument allowanceProcess engineering Electrical & instrumentation
    IN → OUT

    Instruments represented in the source model

    Modeled instrument counts

    Automatic

    Carry represented instrument counts into the estimate.

  3. 47Price the modeled E&I contributionElectrical & instrumentation Cost estimating
    IN → OUT

    Tray, drops, instruments and configured rates

    Modeled E&I cost contribution

    Automatic

    Apply configured rates to the modeled E&I items.

  4. 48Review coverage and transfer the estimateElectrical & instrumentation Cost estimating
    IN → OUT

    Modeled quantities and excluded E&I scope

    Qualified E&I contribution for consolidation

    Review

    The E&I reviewer confirms scope coverage and additional requirements.

FEL 2 / PHASE 12

Bring every estimate back into one number.

TRADITIONAL TIMELINEWeeks 9–10
TRADITIONAL COST$18,400

A complete view of the modeled scope needs more than adding up pipe prices.

160 team hours × $115/hour · Traditional engineering effort
  1. 49Collect discipline cost contributionsProject management & review Cost estimating
    IN → OUT

    Piping, support, concrete and modeled E&I estimates

    Consolidated modeled direct costs

    Automatic

    Calculate represented discipline contributions within one configured cost workflow.

  2. 50Apply indirect and engineering allowancesCost estimating
    IN → OUT

    Modeled direct costs and allowance factors

    Indirect and engineering cost contributions

    Automatic

    Apply configured indirect and engineering allowances to their defined bases.

  3. 51Apply contingency and explain estimate coverageCost estimating Project management & review
    IN → OUT

    Modeled subtotal and contingency basis

    Preliminary TIC for the modeled scope

    Automatic

    Calculate contingency and produce a qualified installed-cost summary.

  4. 52Review the consolidated estimateCost estimating Project management & review
    IN → OUT

    Cost breakdown and assumptions register

    Estimate review comments

    Review

    Your estimator reviews the consolidated cost basis and exclusions.

FEL 2 / PHASE 13

One change can send the work around again.

TRADITIONAL TIMELINEWeeks 11–12
TRADITIONAL COST$20,000

A moved equipment item affects routes, quantities, supports and the estimate.

160 team hours × $125/hour · Traditional engineering effort
  1. 53Send scope changes back to layout and pipingProject management & review Layout team
    IN → OUT

    Review comments and changed project assumptions

    Revised generation inputs

    Review

    Reviewers agree the changes that should enter the next concept run.

  2. 54Update routes, takeoffs and cost inputsPiping team Cost estimating
    IN → OUT

    Updated equipment arrangement and routing basis

    Regenerated quantities and modeled costs

    Automatic

    Rerun placement, routing and configured estimate generation from revised inputs.

  3. 55Assemble the revised concept packageCost estimating Project management & review
    IN → OUT

    Updated plans, quantities and estimate outputs

    Coordinated concept review package

    Automatic

    Generate the concept deliverables and supporting assumptions together.

  4. 56Complete engineering review and decide the next stepProject management & review
    IN → OUT

    Concept package, estimate and open issues

    Reviewed concept and disposition of issues

    Review

    Qualified engineers retain review, acceptance and the decision to proceed.

TRADITIONAL COST THROUGH FEL 212 weeks

$175,960

1,632 modeled team hours in the traditional engineering workflow.

FEL 1 support$39,480
Additional FEL 2 work+ $136,480
Total traditional engineering cost$175,960

Illustrative traditional cost model. Workstreams overlap; hours are not elapsed time.

WITH FORGE / A MUCH LOWER PROJECT COST

One project. One flat fee.

Agree the scope and fee upfront. We deliver the concept package for your engineers to review.

Discuss a Project
The assumptions behind the dollars

A bounded process or utility concept.

Approximately 30–40 equipment items, an available process basis, and a defined support scope. Four illustrative weeks for FEL 1 plus eight for FEL 2. Phase budgets are hours × assumed loaded internal rates, which include employment/overhead assumptions rather than customer billing margins.

The hours and $95–$125/hour rates are scenario assumptions, not published industry benchmarks. Each phase is counted once. Waiting periods do not add labor cost automatically, and overlapping workstreams do not add elapsed weeks together.

Engineering cost and installed cost are different.

The scrolling ledger models the traditional engineering effort to develop the concept. The installed-cost estimate describes the modeled physical scope: materials, supports, concrete, labor and allowances. Complete FEL packages may also require process studies, safety, permitting, economics and other disciplines outside this illustration.

Forge’s 5–15 minute generation figure is an unmeasured planning estimate after inputs are prepared. Intake, validation and engineering review are separate. Forge charges one flat project fee agreed upfront for the scoped package. This illustration does not assign a specific Forge price or savings percentage.

Traditional engineering-effort model — USD
PhaseHoursRateCost
FEL 1 / Estimate the work before doing the work.64$110$7,040
FEL 1 / Turn early information into a working basis.96$100$9,600
FEL 1 / Find room for everything. Then find a better arrangement.128$105$13,440
FEL 1 / Put an early cost against the concept.40$110$4,400
FEL 1 / Bring the disciplines back to one decision.40$125$5,000
FEL 2 / Make the equipment connections work in space.288$100$28,800
FEL 2 / The piping is drawn. Now count what it contains.192$95$18,240
FEL 2 / Price every material. Build the installed-cost estimate.128$110$14,080
FEL 2 / The pipes need supports. Those need an estimate too.128$110$14,080
FEL 2 / Concrete has its own takeoff, rates and handoff.128$110$14,080
FEL 2 / Carry the modeled E&I scope into the cost picture.80$110$8,800
FEL 2 / Bring every estimate back into one number.160$115$18,400
FEL 2 / One change can send the work around again.160$125$20,000
Cumulative through FEL 21632—$175,960

04 / THE OUTPUT

From your files and photos
to a full project package.

Upload the relevant files and photos you have. Our AI-based system generates your full Total Installed Cost (TIC) estimate, line list, 3D models, and FEL 1 / FEL 2 deliverables. See an example site plan and its generated output below.

01 / SITE PLAN
Colored sectional site-plan photograph showing equipment zones, roads and parking
Upload your relevant files and photos.

Our AI-based system generates your full TIC estimate, line list, 3D models, and FEL 1 / FEL 2 deliverables for your engineers to review.

Example input: a site-plan photo. Explore the generated site model alongside it.

02 / GENERATED OUTPUT
Full-site concept with turbine packages, roads, drainage and utilities
103Modeled equipment and assets
114Scoped connections routed
3DInteractive site model

Concept demonstration. Project dimensions, quantities and assumptions are reviewed by your engineers before design use.

ONE CONNECTED SITE CONCEPT

The equipment is only part of the site.

The model includes turbine packages, storage, electrical equipment, access roads, parking, crane hardstands, drainage, containment, and utility routes. Hide the ground to inspect the services underneath.

FROM GEOMETRY TO PROJECT QUANTITIES

Review the physical scope together.

Equipment, routes and civil works share one project basis. The complete engineering report adds the detailed quantities, estimate basis, assumptions and review items.

Bring the information you have.
We’ll define the next useful package.

Discuss a Project

05 / PRACTICAL KNOWLEDGE. EXECUTABLE RULES.

Engineering experience,
built into the workflow.

LEADERSHIP TEAM

Our leadership team combines decades of industry experience with software and automation expertise. We turn repeatable engineering tasks into a maintained workflow, then work with your team to review the result.

START WITH THE PROJECT IN FRONT OF YOU.

Bring us the diagram.
Let’s scope the concept.

A process sketch, an equipment list, or an early project brief. We’ll discuss the inputs, outputs and review your team needs.

Discuss a Project